Before-concealment + milestone capture

Know what is inside the building before the walls hide it.

Blue point cloud of a construction milestone with exposed wall framing and mechanical systems
Owner + construction managerEstablish the baseline

Create a dated record before demolition, mobilization, or new work changes the site.

For property managers and owners, a scan between rough-in and close-up preserves the visible placement of building systems before drywall, ceilings, shafts, and chases turn them into permanent uncertainty.

CONSTRUCTION // MILESTONE REGISTER

Property-manager record / before close-up

Drywall turns visible systems into permanent uncertainty.

Schedule capture after rough-in and required inspections, but before walls, ceilings, shafts, and chases close. The result preserves a spatial record of what was visible and where it was installed at capture time.

01

Piping + plumbing

Supply, waste, and vent piping; valves; branches; and wall, floor, or ceiling penetrations.

Find visible routing context before opening a finished surface.
02

Electrical

Conduit, boxes, cable trays, panel context, pathways, and penetrations visible during the capture.

Give future renovation teams more than scattered progress photos.
03

Mechanical

Ductwork, equipment, hangers, routing, penetrations, and visible clearance relationships.

Preserve installation context for maintenance and future coordination.
Without the recordOpen walls, trust memory, hunt through photos, or remobilize the team.
With the recordRevisit captured installation context during maintenance, renovation, coordination, or dispute review.

The scan documents visible conditions at capture time. It does not identify materials that were already concealed, certify code compliance, replace required inspections, or provide a licensed survey.

Capture moments

Built around irreversible project transitions.

Select milestones based on risk: before concealment, after major installations, at payment or owner-review stages, and before turnover.

01

Preconstruction

Create a visual and spatial baseline before demolition or mobilization changes the site.

02

Before concealment

Record visible piping, conduit, boxes, ductwork, framing, penetrations, equipment, and clearances before walls or ceilings close.

03

Progress milestone

Capture agreed exterior and interior areas for a more contextual progress record.

04

Turnover record

Organize final visible conditions into a scoped handoff package for the owner, property manager, or facility team.